Abstract

As an important chemical intermediate, 2-mercaptobenzothiazole (MBT) is widely used in various processes, especially in the rubber industry. However, there is no first-principles model that describes the synthetic process of MBT. This paper focuses on the formulation of a reliable mathematical model represented by a series of differential and algebraic equations for the industrial batch MBT production process. It is difficult to estimate all of the unknown parameters in the model because of the lack of sufficient industrial/experimental data. Thus, a reduced estimable parameter set is derived by performing estimability analysis on the original estimation problem. A multiple-starting-point strategy is then applied to numerically solve the non-convex parameter estimation problem with the weighted least-squares approach. Subsequently, a cross-validation technique is employed to evaluate the generalizability of the proposed model. Finally, it is confirmed that the proposed model produces encouraging prediction performance with regard to independent test data.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.