Abstract
This paper presents a mathematical model of water quality rehabilitation by utilising rainwater, which is separated into initial polluted rainwater and later unpolluted rainwater. The planned Haigang city, belonging to Shanghai metropolis in China, is taken as a case example. An analysis is made on how to utilise rainwater and appraise its function in a water quality rehabilitation scheme. It is demonstrated that this method can significantly reduce both project investment and operation costs. Moreover, appropriate drainage plan scheme is presented to address the initial polluted rainwater problem. Thus, the conflict between drainage and rainwater utilisation can be resolved appropriately.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Environment and Pollution
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.