Abstract

The article is described a new approach that allows to find the optimal solution to the problem of hybrid plant cost calculations of low and medium power facilities based on renewable energy sources. The calculation is performed using a multivariate analysis of the obtained results. The need to search for the system optimal configuration with maximum capacity at minimum cost is determined by the major setback to use of renewable energy sources, such as the high cost of equipment. Initial data for math model as an example of the Hybrid Plant cost calculation was from nature conditions in Volgograd and cost equipment in the demonstration Zone of Volgograd State Agricultural University. The demo zone was created in the educational research and production center of University for conducting experiments on the self-generated power supply of the facility management.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.