Abstract
Abstract A mathematical model for the optimization of pump scheduling in a water distribution system is proposed. The water system we consider works without a large water storage facility and hence the mass balance principle is the base for the model. A result concerning the pressure drop after T -junctions is the main simplification we propose. An optimization problem is formulated and solved by a Branch and Bound method for a real water distribution system using data from a small city in Serbia.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.