Abstract

AbstractThis paper presents a new multi‐criteria decision model for the material handling device (MHD) selection problem in cellular manufacturing systems. Given a set of manufacturing cells based on several automatic work‐centres, the technique makes it possible to select a particular MHD for each cell in an integrated way, with different constraints being taken into consideration. The approach is based on two different multi‐attribute analyses executed with analytic hierarchy process (AHP) methodology, and a final integer linear programming including important limitations faced by the designer when making MHD investment decisions. An example using real data is provided to illustrate this methodology. Copyright © 2002 John Wiley & Sons, Ltd.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.