Abstract

The CEA colliding beam project requires trigger signals relative to the e- and e+ circumferential beam positions in the accelerator. These triggers are required for proper timing of multicycle injection, steering of the beam into the bypass, triggering of beam monitoring and excitation devices. The synchronizer was built to provide these triggers.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.