Abstract
The customization of final products in the automotive industry involves a large number of optional parts and leads to a huge variety of operation times at the various stations of the assembly line. The master production scheduling problem (MPS) for high-variant mixed-model assembly lines is to assign the individual customer-defined models of a basic product type to short-term production periods while anticipating the negative impacts of an unbalanced model sequence at the lower planning level. We propose a mathematical model formulation for the MPS and develop heuristic solution procedures that attempt to minimize the workload variability. Specifically, these procedures anticipate decisions on the mixed-model sequence and the resulting work overload at stations which has to be balanced by the assignment of utility workers. Furthermore, an integrated planning approach for solving the MPS and the production sequencing problem is proposed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.