Abstract
AbstractThis paper describes a simulation experiment to evaluate the relative effectiveness of rescheduling policies in capacity‐constrained, just‐in‐time (JIT) make‐to‐stock production environments. Three performance measures were analyzed: average finished goods inventory, total units of sales lost, and a measure of schedule instability. Among the three loading methods we studied (level loading, front loading, and back loading), none was superior across all three performance measures. Level loading was the most robust, while back loading had an interaction effect with forecasting model and capacity level. Time fence scenario was found not to be as significant a factor in system performance as reported by previous research. Once an acceptable time fence scenario is selected, attempts to optimize this factor do not appear to offer significant improvement. It was found that higher demand variation, larger forecast errors, and tight capacity lead to the degradation of system performance. Judicious use of slack capacity helps a system to incorporate the periodic schedule changes typical of JIT systems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.