Abstract

This research aims to identify the useful impact of Master Data Management (MDM) on a Business Transformation Programme (BTP). A BTP consists of three distinct phases. The first phase is the selection of the appropriate set of application systems as well as the introduction of new business processes across multiple lines of business and different channels. The second phase is the implementation of the new application systems and the data migration process. The third and final phase is the transition from the legacy application systems and business processes to the newly defined framework of processes and technologies that ensure the business and data continuity. MDM encompasses a pivotal role during the second and the third phase of a BTP and is defined as the process that runs in parallel with any other business process; assigning responsibility to people and technology on processing, capturing, maintaining and defining data accuracy based on a defined set of rules. Multiple parameters relevant to MDM such as change management, no practical commitment from senior management, no compliance with any data governance policies, implementing new integrations or any pre-existing data quality challenges along with multiple others, can jeopardise the successful completion of a BTP. As MDM becomes significant in the second phase, the research focuses on how the invasive circumstances arising from such parameters during this BTP phase and beyond may be addressed by the BTP’s programme directorate to enhance decision-making through the appropriate impact on MDM. The programme committee of a BTP would thus become aware of how to: a) manage master data, b) reinforce enterprise data quality and c) govern the overall BTP lifecycle by safeguarding data practices. Alongside an extensive learned literature review and industry resources to establish the research aims from the outset, the research appropriated a deductive and interpretive research methodology to two Data audits as case studies plus a series of semi-structured interviews and subjected to a comprehensive qualitative analysis. Each BTP either faced challenges or was about to face challenges. The different roles of the participants and the different phases of each BTP in which the audits took place allowed the research to employ these multiple methods to reflect different aspects of the same issue. Referring to the Data Audit Framework for added structure, the two data audits took place in two different companies. The first company was performing the audit after a failed BTP, and they had already an MDM function within the organisation. The audit focused on the performance of its already existing function. The second company had initiated a BTP and wanted to ensure that the required controls were in place for a successful delivery. These two audits provided valuable case study evidence for the evaluation of the decisions made during the BTP with regards to a) master data, b) what led the programme directorate to these decisions and c) how the decisions affected the outcome of the BTP as well as the organisation itself. The interviews consisted of twenty-eight semi-structured questions and involved eighteen people with diverse backgrounds and from divergent functions of the business. All the interviewees were participating in a BTP with an underlying MDM process. The interviews provided evidence on a) how different roles within the programme reflect and react under specific circumstances and b) how each workstream prioritised data-related activities in conjunction with the overall programme. From the case study audits and the interviews, the research identified an enhanced understanding of the reasons behind the decisions during a BTP concerning MDM, and how these decisions consequently affect the successful implementation of a BTP. From these findings, the research proposes a novel MDM-impacted BTP decision model that brings together its contributions to knowledge, and the basis for future work.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.