Abstract

The following article is dedicated to the construction of an investment portfolio consisting of 3 investments from the Polish capital market found in the WIG20 index and from investment in gold. The purpose of the study was to determine the optimal length of the estimation window for building a portfolio with minimal risk and maximum efficiency. The length of the estimation window was also assessed in terms of the rate of return and the maximum cumulative loss. Data from 2017 was used to build the portfolio, and the weightings determined for the portfolio based on these data were evaluated using data from 2018 (from January to October). Based on the research, it was found that the optimal length of the estimation window ranges from 144 to 160 daily observations from the past. However, depending on the investment objective (risk minimization or maximization of efficiency) and the characteristics describing the portfolio, other lengths of the estimation window may also be appropriate.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.