Abstract
Construction price forecasting is an essential component to facilitate decision-making for construction contractors, investors and related financial institutions. Construction economists are increasingly interested in seeking a more analytical method to forecast construction prices. Although many studies have focused on construction price modelling and forecasting, few have considered the impacts of large-scale economic events and seasonality. In this study, an advanced multivariate modelling technique, namely the vector correction (VEC) model with dummy variables, was employed. The impacts of global economic events and seasonality are factored into the model to forecast the construction price in the Australian construction market. Research findings suggest that both long-run and dynamic short-term causal relationships exist among the price and levels of supply and demand in the construction market. These relationships drive the construction price and supply and demand, which interact with one another as a loop system. The reliability of forecasting models was examined by the mean absolute percentage error (MAPE) and the Theil's inequality coefficient U tests. The test results suggest that the conventional VEC model and the VEC model with dummy variable are both acceptable for forecasting the construction price, while the VEC model considering external impacts achieves higher prediction accuracy than the conventional VEC model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.