Abstract

The ability of a market type mechanism to significantly reduce the compliance costs of current state and national erosion standards is investigated. The ability of such an institution when applied to a recursively produced pollutant such as sediment from agricultural land is, however, extremely sensitive to the order in which contracts are executed. The gain-ranked order of contracting is found to result in a larger reduction in costs than the mean cost reduction calculated under a random order of contracting. The degree to which actual contracting more closely corresponds to the random or gain-ranked order is, therefore, of crucial importance given the desirability of achieving a sediment load at the least cost possible.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.