Abstract
Marginal costs of electricity vary by time and location. Past researchers attributed these variations to factors related to electricity generation, transmission and distribution. Past authors, however, did not fully analyze the large variations in marginal distribution capacity costs (MDCC) by area and time. Thus, the objectives of this paper are as follows: (1) to show that large MDCC variations exist within a utility's service territory; (2) to demonstrate inter-utility variations in MDCC; and (3) to demonstrate the usefulness of these costs in determining demand for distributed generation (DG).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.