Abstract

With the improvement of environmental protection requirements, risk analysis is significant for environmental impact assessment accidents (EIAA) of construction projects. Currently, many risk variables can cause EIAA, and risk probabilities of EIAA are various in different risk scenarios. Therefore, the aim of the study is to explore various risk scenarios with different risk probabilities of EIAA. According to the results of risk variables, which were studied by Grounded Theory (GT), the risk scenarios with high risk probabilities of EIAA are proposed by Bayesian Network (BN) in this study. This study finds that 1) 21 risk variables contained 5 categories involve invalid data, fuzzy evaluation scope, unreasonable evaluation model, unreasonable evaluation conclusion, incomplete assessment report. 2) critical risk variables causing EIAA contain lacking of personnel signature in EIA report, unreasonable project site selection, unreasonable evaluation grade of pollution source. 3) there are 4 risk scenarios with high risk probabilities of EIAA, and their risk probabilities are 90.3%, 90.3%, 89.6%, 89.6%, respectively. These findings offer a good reference for the environmental impact assessment of construction projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.