Abstract
The study assessed manufacturing system optimization using computer-based control kanban loops. The study assessed JIT's effect on average throughput-time, demand fill rate, net operating income for a certain product mix complexity and manufacturing overhead level. ARENA/SIMAN and WITNESS simulation tools were used to study implementation. The Drug Process Plant's JIT system reduced end buffer inventory, shortened customer lead time, and improved visual control. The mean response of the simulated new physical system in terms of NOI was 85.54 but gave a mean response of 85.30 when implemented on the shop floor. The mean response of the simulated new physical system in terms of cycle time was 617 but gave a mean response of 634 when implemented on the shop floor. Simulated new physical system in terms of DFR gave a mean response of 93.11 when implemented on the shop floor. Overwhelmingly, the new JIT system outperformed the old physical system. Bangladesh J. Sci. Ind. Res. 57(4), 221-228, 2022
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Bangladesh Journal of Scientific and Industrial Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.