Abstract

The superconducting radiofrequency electron linear accelerator of the Shanghai HIgh repetition rate XFEL aNd Extreme light facility (SHINE) will use 600 TESLA-style cavities with 1.3 GHz fundamental power couplers for continuous-wave operation. The first batch of 26 1.3 GHz coupler prototypes has been fabricated from three domestic manufacturers for qualification. Several key manufacturing processes have been developed and qualified, including high residual resistivity ratio copper plating, vacuum brazing of ceramic windows, electron beam welding, and titanium nitride coating. In addition, uniform quality control and inspection processes have been established to ensure the power couplers meet the requirements for the intended use in the SHINE project. All the 1.3 GHz coupler prototypes have been power conditioned with 14-kW traveling wave and 7-kW standing wave rf in continuous-wave mode. Even higher power levels have been demonstrated with 20-kW traveling wave and 10-kW standing wave rf, which indicates their robustness.11 MoreReceived 27 July 2022Accepted 7 November 2022DOI:https://doi.org/10.1103/PhysRevAccelBeams.25.113501Published by the American Physical Society under the terms of the Creative Commons Attribution 4.0 International license. Further distribution of this work must maintain attribution to the author(s) and the published article’s title, journal citation, and DOI.Published by the American Physical SocietyPhysics Subject Headings (PhySH)Research AreasSuperconducting RFAccelerators & Beams

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call