Abstract

The key components of the Helium Cooled Pebble Bed Test Blanket Module (HCPB TBM) in ITER are the Breeder Units (BU). These are the responsible for the tritium breeding and part of the heat extraction in the HCPB TBM. After a detailed design and engineering phase performed during the last years in the Karlsruhe Institute of Technology (KIT), a reference model for the manufacturing of a HCPB BU mock-up has been obtained. The mid-term is the out-of-pile qualification of the thermal and thermo-mechanical performance of a full-scale HCPB BU mock-up in a dedicated helium loop. Several key manufacturing technologies have been developed for the fabrication of the HCPB BU. In order to pre-qualify these techniques, a Short Breeder Unit mock-up (SHOBU) is under construction and to be tested. This paper aims at describing the relevance of SHOBU with a full-scale HCPB BU, the constitutive parts of SHOBU, the manufacturing and joining technologies involved, the assembly sequence (taking into consideration functional steps like its filling with Li4SiO4 pebbles or its assembly in the HCPB TBM) and the welding procedures studied. The paper concludes with a description of the required pre-qualification tests performed to SHOBU, i.e. pressure and leak tightness tests, according to the standards.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.