Abstract

This article addresses flexible manufacturing system (FMS) Performance is likely to improve with employment of various resources efficiently. Initially simultaneous scheduling problems are solved by means of priority rules like first come first serve (FCFS), shortest processing time (SPT) and longest processing time (LPT) to find out the operational completion time for 120 problems. Later gene rearrangement genetic algorithm (HGA) is implemented for same set of problems with makespan as objective and the results are compared with the results of priority rules. The results are performed well by using HGA. The same HGA is used to find the finest optimal sequence that minimize the operational completion time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.