Abstract
Transportation disruption, a common source of business interruptions, can cause significant economic loss to a lean supply chain. This paper studies a lean, two-stage supplier-manufacturer coordinated system where a sudden disruption interrupts the transportation network, creating delivery delays and product quantity losses. We develop a model to generate a recovery plan after a sudden disruption occurrence, helping supply chain managers minimize the negative impacts of the disruption. Given the computational intensity and problem complexity, we then propose three heuristic solutions based on the delivery delay and fractional quantity loss caused by a sudden disruption. Finally, We conduct a number of numerical experiments to validate our proposed solution methods, and a scenario-based analysis to test the model and analyse the impact of sudden transportation disruption under three disruption scenarios. The performance of presented heuristics against the generalized reduced gradient method is also compared. The results reveal that the proposed heuristics can generate a recovery plan accurately and consistently.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.