Abstract
Risk management is an important part of construction management, yet the risk-based decision support tools available to construction managers fail to adequately address risks relating to cost, schedule, and quality together in a coherent framework. This paper demonstrates the usefulness of the Advanced Programmatic Risk Analysis and Management Model (APRAM) originally developed for the aerospace industry, for managing schedule, cost, and quality risks in the construction industry. The usefulness of APRAM for construction projects is demonstrated by implementing APRAM for an example based on an actual building construction project and comparing the results with other risk analysis techniques. The results show that APRAM simultaneously addresses cost, schedule, and quality risk together in a coherent, probabilistic framework that provides the information needed to support decision making in allocating scarce project resources.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.