Abstract

Unexpected project risk events are important for managers to evaluate and control large-scale projects. In the past, these issues are widely handled by event studies. However, event studies have been criticized for its irrational assumption, such as normal distribution and constant variance. In this paper, we consider a dummy GARCH model, which releases the assumption of the normal distribution, to deal with the impact of unexpected project risk events. In addition, the important events are detected automatically by using the ICSS, instead of determining by decision makers. From the result of our empirical studies, it can be seen that the flexibility of the proposed method is better than that of traditional event studies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.