Abstract

Public–private partnerships (PPPs) are contractual schemes that have relative success in Latin America due to their configuration, where the spirit of the contract lies in an appropriate distribution of risks. This is both the most important and fundamental aspect of this contractual scheme but also the most complex, as it is the main cause of contract modifications (addenda) in countries across the region. In this context, different concessionary contractual frameworks for PPPs on the national road network of Peru were evaluated, revealing common failure indicators that lead to contract modifications within the first six years of the concession. This study offers the development of a management model that includes the good practices of contractual management of NEC4 Option F and the application of BIM information management processes, optimizing the management of infrastructure through emerging technologies of information management supported by agile contractual schemes.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.