Abstract

Project Management techniques, such as gannt charts, were first applied in shipping as the need for swift recovery to seaworthiness is not but one of the many constrains facing the sector. In general, the operational environment of Maritime Business is dynamic, challenging, volatile and turbulent, demanding continuous planning, budgeting, controlling and adaptation to ever changing international conditions. Vessels are chartered (contracted) and seen as a commodity creating a portfolio. When combining this aspect with the actual operation of the vessel (voyage estimating, crewing, supplies, maintenance etc.), ship management is analyzed as beingcomplex and/orchaotic. Additionally, the growth of Ship Management Companies has brought about new dimensions in the management of vessels. The paper investigates the existence of management by projects in the Shipping Sector, identifies key features and speculates on the possibility of improved performance by introducing project management techniques and procedures.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.