Abstract

A Midwestern pulp and paper mill had arc-flash ratings around 100 cal/cm <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">2</sup> on 50 480-V unit substations. New relays were installed to replace the existing protection and add light detection to improve arc-flash detection times. During a couple of one-day outages, sample installations took place. During the cold mill outage, 44 installations were completed over 12 days by working around the clock. Old relays were removed, new plates were mounted and wired in, and fiber sensors were routed through the buswork and into the breaker cubicles. Updated arc-flash studies show an average arc-flash rating reduction of 90%.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.