Abstract
Results are reported from a study of BOF steelmaking at the Cherepovets Metallurgical Combine (CherMK), and the main measures that can make the BOF shop more efficient are described. The measures include improving the logistics of transport operations, the installation of new production equipment, or upgrade of the existing equipment. It is shown that the technical-economic indices of the shop can be improved in a short period of time at minimal cost by adopting a comprehensive approach to modernization of the present facilities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.