Abstract

In this study, we consider a permutation flow shop scheduling problem on a three-machine with deteriorating jobs (a deteriorating job means that the job's processing time is an increasing function of its starting time) so as to minimize the makespan. We model job deterioration as a function that is proportional to a linear function of time. For some special cases, we prove that the problem can be solved in polynomial time. We develop branch-and-bound and heuristic procedures for the general case. Computational experiments for the branch-and-bound algorithm and heuristic algorithm are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.