Abstract

The ARIES-CS study has been launched with the goal of developing through physics and engineering optimization an attractive power plant concept based on a compact stellarator configuration. The first phase of the study involved scoping out different physics configurations including two and three field period options. The engineering effort during that phase aimed at scoping out maintenance schemes and power core designs best suited to a compact stellarator configuration. This led to a down selection of the most attractive blanket configurations and maintenance schemes for more detailed studies during the second phase of the study. This paper summarizes early results from the second phase of the ARIES-CS study with a particular emphasis on the engineering effort.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.