Abstract

This paper proposes a quantitative approach for selecting effective maintenance strategies for metro tunnels in order to reduce maintenance cost and ensure tunnel safety in the presence of structural degradation during the service life. A non-stationary gamma process is used to simulate the tunnel gradual degradation and to investigate the effects of different maintenance measures on the life cycle maintenance cost of metro tunnels in soft soil. Two commonly applied reinforcement methods, Aramid Fibre Reinforced Polymer and bonded steel plate reinforcement, are investigated in this study. The feasibility of the proposed methodology is demonstrated with maintenance strategies based on periodic and aperiodic inspection policies. Numerical results show that the optimisation of maintenance strategy can reduce the life cycle maintenance cost of metro tunnels in soft soil while ensuring sufficient level of structural safety, and the maintenance strategy with aperiodic inspection policy produces lower maintenance cost.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call