Abstract
Abstract In this paper a basic methodology was used for the reliability modeling and developing a maintenance program for a fleet of four drilling rigs. Failure and performance data was collected from Sarcheshmeh Copper Mine in Iran for a two-year period. Then the available data was classified and analyzed and reliability of all subsystems and whole rigs were modeled and studied. The failure data showed that, in all rigs, electrical, hydraulic and drilling systems are the most frequent failing subsystems of the machine. The reliability analysis showed that transmission system is the most reliable subsystem in all studied rigs. In order to calculate the reliability of whole fleet, it was assumed that operation of at least two drilling rigs is essential for satisfying the production goals. Therefore, probabilistic possibility of all fleet’s states were calculated. In this paper, 80% is selected as the desired level of reliability for developing of preventive maintenance program for each subsystem of the drilling rigs. Finally, the practical approaches were suggested for improving the maintenance operation and productivity of the studied fleet.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.