Abstract

Based on the historical damage data that has been obtained from the maintenance department of PT. XYZ, the Shot Blast MACH MWJ 9/10 machine is a machine that has a high degree of damage or unreliability which can cause losses for the company. The resulting loss can be time losses and also cost losses. The purpose of this study is to determine the value of company losses due to machine unreliability using the Cost of Unreliability method and Business Consequence analysis. From the results of COUR calculations, the cost caused by unreliable based on corrective time is IDR 3.299.079.131,24 and based on downtime or the length of time the subsystem stops is IDR 7.220.699.784,37. After COUR calculations, the next step is to make a business consequence. Business consequence is made for the company to use the business risk matrix and the results are all the subsystems, namely in the red category, so companies need to take action to prevent the higher consequences.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.