Abstract

Carry out in-depth research on the electricity metering project of the biomass gasification coupled power generation project of Hubei Huadian Xiangyang Power Generation Co., Ltd., and upgrade the existing metering capacity based on the requirements of the power industry standard "Calculation of biomass energy from coal-fired coupled biomass power generation Part 1: Gasification coupling of agricultural and forestry waste residues" to form a complete, accurate and advanced electricity metering capacity. In view of the shortcomings of the hardware and software of the current electricity metering, we will improve and upgrade them one by one. In this plan, the existing biomass energy and electricity metering system is planned to be modified by replacing the sampling system, pre-treatment system, adding missing parameters of the analyzer, adding power measuring points, replacing gas, steam and condensate flow meters, and arranging explosion-proof cabins.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call