Abstract

This paper presents the main achievements of the European Home Team (EU HT) test programme of ITER primary wall small scale mock ups. It describes briefly the fabrication method of the mock ups, the test conditions and the main results obtained with high heat flux and thermal fatigue tests of Cu alloy/stainless steel and beryllium/Cu alloy/stainless steel mock ups. The results obtained so far show very good thermal fatigue performance and operation margin of the ITER primary first wall concept.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call