Abstract

The transient response of two, three, and four series L-C loop systems is examined, and results are presented of a case study of voltage magnification on an actual system with shunt capacitors at four different voltage levels. On this system, equipment damage occurred within an industrial plant in the same time frame of the energization of a capacitor bank in a utility substation.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.