Abstract

With the recent proliferation of unmanned aerial vehicles for geophysical surveying, a novel opportunity exists to develop unmanned ground vehicles in parallel. This contribution features a study to integrate the Husky A200 robotic development platform with a GSMP 35U magnetometer that has recently been developed for the unmanned aerial vehicle market. Methods to identify and reduce the impact of magnetically noisy components on the unmanned ground vehicle platforms are discussed. The noise generated by the platform in laboratory and gentle field conditions, estimated using the fourth difference method for a magnetometer–vehicle separation distance of 121 cm and rotation of the chassis wheels at full speed (1 m/s), is ±1.97 nT. The integrated unmanned ground vehicle was used to conduct two robotic magnetic surveys to map cultural targets and natural variations of the magnetic field. In realistic field conditions, at a full speed of 1 m/s, the unmanned ground vehicle measured total magnetic intensity over a range of 1730 nT at 0.1 m spatial resolution with a productivity of 2651 line metres per hour.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.