Abstract
The U.S. Hi-Lumi LHC Accelerator Upgrade Project (AUP) and CERN have joined efforts to develop high field quadrupoles for the Hi-Lumi LHC upgrade. The US national laboratories in the AUP project will deliver 10 magnets and each cryostat has two 4.2 m high gradient quadrupoles in it. These magnets are made of Nb3Sn conductors, with large aperture (150 mm) and integrated gradient of 556.9 T. This paper reports on magnetic measurements performed during the vertical test at Brookhaven National Laboratory (BNL) in 2019-2020. A warm measurement Z-Scan (+/-15 A) with 42 Z-positions before cool-down was performed at BNL. The results were directly compared to field data measured at LBNL during magnet assembly. Measured harmonics and magnetic center offsets (ΔX and ΔY) have provided timely and informative diagnostics on the magnet structure's shape at both warm and cold temperatures. A new centering fixture was designed and added to better center the warm bore tube which contains the rotating coil probe. After the quench training to 16.47 kA was achieved, a complete set of cold measurements (Z-Scan at 16.47 kA and I-Scan from 960 A to 16.47 kA and back to 960 A) was made. Periodic axial variation of allowed and nonallowed harmonics was observed which is related to the coil radial and/or mid-plane variations along the magnet axis. Overall, the average harmonics in the straight section are within the required field boundaries.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.