Abstract
Installation of the kicker magnets in the extraction section of the RCS in J-PARC facility was completed. They extract a proton beam accelerated up to 3GeV. Since high voltage of 30 kV, which corresponds to 60 kV for charging the pulse forming line, is applied to the magnet every 40 msec, they are installed in vacuum chambers to prevent the electrical breakdown. However, magnetic field mapping is difficult in vacuum. Therefore, we performed the mapping in the air with applying one third of the operational voltage after checking linear dependence of magnetic field to exciting current. A short search coil on the 3-axis stages was used in the magnetic field mapping. The results showed that the good uniformity was achieved in the whole aperture. The magnetic field distribution of the same type of kicker magnet was in good agreement with each other. The excitation test with the operational charging voltage of 60 kV was also performed in vacuum. At the first stage, we were bothered by the electric breakdown. It was noticed that the reduction of outgassing rate by baking was very effective to suppress the discharge. And the continuous excitation was found to have a conditioning effect for the stable operation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.