Abstract

Kicker magnets are required for all ring-to-ring transfers in the 5 rings of the proposed KAON Factory. The must rise from 1% to 99% of full strength during the time interval of gaps (80 ns to 160 ns) created in the beam so that beam extraction losses are minimized. The kick strength must have a uniformity of /spl plusmn/1% over the useful aperture of the magnet. PE2D calculations have been performed to determine the uniformity of the combined electric and magnetic in the aperture of a TRIUMF prototype kicker magnet. Measurements of the magnetic field were performed with 50 /spl Omega/ striplines while the prototype magnet was excited with a low voltage 1 MHz sine wave. The predicted and measured results for the magnetic field in the kicker magnet are in good agreement, and are presented. The circuit analysis code PSpice has been utilized to mathematically model the magnet and stripline probe, and the results of the simulations have provided a better understanding of the effect of parasitics upon the measurements. >

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call