Abstract

This article provides a description of the site visit to Sloy dam at Loch Sloy, and the Sloy hydroelectric power (HEP) station at Loch Lomond carried out as part of the 16th biennial conference of the British Dams Society in Glasgow 2010. The visit took place on 28 June 2010 and included tours of the turbine hall, the control room, the high-pressure pipelines and the concrete buttress dam. The visit included a presentation on Scottish and Southern Energy's dams and reservoir assets as well as the construction of the dam and power station and future site improvement plans.