Abstract
The 7.5 km long and 6,3 m diameter La Maddalena pilot tunnel is part of the international project of the new high speed rail link between Turin and Lyon, on the Italian side of the project (Chiomonte, TO). Among the geological surveys that are systematically performed during the excavation of the pilot tunnel, groundwater inflow and temperature of water and rock mass are measured. This paper analyses the recorded data to April 2016 in order to verify the hydrogeological and geothermal forecasting models and assess the energy potential of the inflows that are expected to be intercepted by the future base tunnel excavation. The collected data confirm the possibility of a sustainable management of groundwater and heat geoexchange.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Acque Sotterranee - Italian Journal of Groundwater
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.