Abstract

A method of forecasting the balance of electricity consumption of urban development objects, civil purposes using discrete macromodels is proposed. We consider the power supply system (PSS) of the district, which is characterised by power supply from general-purpose power grids, as well as having its own generation of electricity from renewable energy sources (RES). Such a local electric power system (LES) under certain conditions can be operated as an independent balanced electrical facility. For optimal operation of the LES under these conditions, it is necessary to predict its power consumption schedules. The proposed macromodelling method allows to develop deterministic models of power consumption with the required accuracy on the basis of retrospective information without the use of data preprocessing procedures. The solution to the problem of forecasting electricity consumption schedules is simplified by using only basic or deterministic characteristics in the construction of the model. These include fractal properties of PSS load schedules.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.