Abstract

Production machine is a crucial thing to be taken care of in order to keep the production flow stays in the right time, therefore maintenance management is needed. PT. XYZ is a manufacturing company that produces cables. One of the machines that are used and often experiences downtime is the drawing machine. Preventive Maintenance handling interval schedule could be designed by using Reliability Centered Maintenance II method. There are several ways for the data processing, which are FMEA calculation, RCM II Diagram Decision Worksheet, TTF and TTR parameter calculation, determining the correct distribution using Least Square Curve Fitting and Goodness of Fit, MTTF and MTTR calculation, reliability comparation between the conditions before and after the Preventive Maintenance is implemented, cost savings comparation between the condition before and after the maintenance is done. This research proves that interval 3 formulation with the Pay Off for 361 hours, Dancer for 327 hours, and Double Spooler for 174 hours would enhance the reliability of Pay Off to 52%, so could it to Dancer (to 57%) and Double Spooler (75%). It also proves that by implementing Preventive Maintenance with the formulated interval and the result of RCM II Decision Worksheet indicators would produce in cost savings for the Pay Off part to 25,96%, the Dancer to 35,1%, and Double Spooler to 53,52%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.