Abstract

In order to develop a method for forecasting the costs generated by rock and gas outbursts for hard coal deposit "Nowa Ruda Pole Piast Wacław-Lech", the analyses presented in this paper focused on key factors influencing the discussed phenomenon. Part of this research consisted in developing a prediction model of the extentof rock and gas outbursts with regard to the most probable mass of rock [Mg] and volume of gas [m3] released in an outburst and to the length of collapsed and/or damaged workings [running meters, rm]. For this purpose, a machine learning method was used, i.e. a "random forests method" with the "XGBoost" machine learning algorithm. After performing the machine learning process with the cross-validation technique, with five iterations, the lowest possible values of the mean-square prediction error "RMSE" were achieved. The obtained model and the program written in the programming language "R" was verified on the basis of the "RMSE" values, prediction matching graphs, out of sample analysis, importance ranking of input parameters and the sensitivity of the model during the forecast for hypothetical conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.