Abstract

Punctuality is a sensitive issue in large airports and hubs for passenger experience and for controlling operational costs. This paper presents a real and challenging problem of predicting and explaining flight off-block delays. We study the case of the international airport Paris Charles de Gaulle (Paris-CDG) starting from the specificities of this problem at Paris-CDG until the proposal of modelings then solutions and the analysis of the results on real data covering an entire year of activity. The proof of concept provided in this paper allows us to believe that the proposed approach could help improve the management of delays and reduce the impact of the resulting consequences.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.