Abstract

The High Energy X-Ray Timing Experiment (HEXTE), currently under development for the X-Ray Timing Explorer (XTE) mission, employs a closed loop gain control system to attain 0.5 percent stabilization of each of eight-phoswich detector gains. This Automatic Gain Control (AGC) system utilizes a split window discriminator scheme to control the response of each detector pulse height analyzer to gated Am-241 X-ray events at 60 keV. A prototype AGC system has been implemented and tested within the gain perturbation environment expected to be experienced by the HEXTE instrument in flight. The AGC system and test configuration are described. Response, stability and noise characteristics are measured and compared with theoretical predictions. The system is found to be generally suitable for the HEXTE application.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.