Abstract

According to the characteristic of multi-arch highway tunnel,based on a practice engineering, the monitoring work was consisted of four sections:the displacement of surrounding rock; such as crown settlement, displacement of the ground, displacement of inner surrounding rock; that of stress and stain of support structure; that of force in middle-wall. In course of construction,monitoring data was analyzed in time.Structural timbering parameters were modified in response to abnormal monitoring data in order to guarantee safety.the testing results of the safety monitoring system are satisfactory, which serves as a symbol of our research work. Thus, our engineering practice has proved the applicability and feasibility of the safety monitoring and information construction methods.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call