Abstract

A given behavioral specification can be implemented on a large number of register-transfer level designs. Instead of producing several designs and selecting the best one, synthesis systems may use estimation to reduce the design space. In this paper, we present a new technique for computing a lower-bound completion time for non-pipelined resource-constrained scheduling problem. Given a data flow graph, a set of resources, resource delays and a clock cycle, we derive a lower-bound on the completion time of a schedule. Our technique can handle chaining, multi-cycle operations and pipelined modules. The technique is very fast and experimental results show that it is also very tight. >

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.