Abstract

On the basis of the domestic and overseas scholars’ research, it is innovative to put forward a new precast frame beam-to-column connection. One full-scale beam-to-column connection in a precast concrete(PC)frame and a beam-to-column connection in a cast-in-place concrete structures were tested under uni-directional cyclic loading that simulated earthquake-type motions. The new-type beam-to-column joint in a precast concrete frame consisted of cast-in-place columns and precast beams. Test results showed that(a)The property and action of precast connections are similar to the cast-in-place connection, it showed that both precast connections and cast-in-place connection have similar seismic performance; (b) The cracking load of precast connection are similar to the cast-in-place connection; (c) All the columns of all specimens did not destroy, it illustrate that it conform to the strong column weak beam. (d) In this experiment test, because the control factor use the bending capacity of beam, it also play the same plastic hinge mechanism as the traditional component. All the longitudinal reinforcement destruction ahead of stirrup in beams, which should be confirmed the guiding ideology of strong shear weak bending. On the basis of the test results, design considerations for the beam-to column connection were recommended.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call