Abstract

In this paper, the energy efficiency of bromine production site is analysed and pathways for heating and cooling demands reduction are proposed. Detailed inspection of the process stream system and heat integration on process and site levels was performed. The enterprise capacity is 25 t/d of sodium bromide crystals and 27 t/d of liquid bromine, the concentration of bromine ion in the raw material is 0.8–1 g/L. The PA (Pinch Analysis) and TSA (Total Site Assessment) were used for estimation of energy saving potential and design of retrofit project. Heat recovery on site level is performed by intermediate utility applying Total Site Profiles. Structure of heat recovery system and minimal temperature difference are determined. It is shown that the process with improved heat integration consumes 57% of hot and 97% of cold utilities required by existing production site.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.