Abstract

Over the past decades many accelerator facilities have been built in order to produce radioactive nuclei. Among the falcility under construction, SPES (Selective Production of Exotic Species) is the Italian ISOL (Isotope Separation On Line) facility in the installation phase in these years in the Laboratori Nazionali di Legnaro. The innovative aspect of this facility is that the radioactive beam produced by fission induced by the proton beam, produced by a high power cyclotron, interact with a multi-disks uranium carbide target. The formed RIB will be sent directly to the low energy experimental area and, afterwards, to the post-acceleration complex. Currently the installation program concerning the SPES RIB source provides the set-up of the apparatus around the production bunker. The main objective of SPES project is to provide, in the next years, the first low-energy radioactive beams for beta decay experiments using the b-DS (beta Decay Station) set-up and for radiopharmaceutical applications by means of the IRIS (ISOLPHARM Radioactive Implantation Station) apparatus. In this work, all the specific issues related to the SPES RIB and the Low Energy beam lines will be reported. The main RIB systems, such as ion source systems, target-handling devices and the installation of low energy transport line, will be presented in detail.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.