Abstract
The issue in Lot Streaming is how to split lots into sublots in order to improve the makespan (or some other criterion). We present a model and an iterative procedure for a general job-shop environment. The procedure alternates between solving a lot-sizing problem with a given sequence of sublots on the machines, and a standard job-shop scheduling problem with fixed sublot sizes. We report the computational results on a significant sample of 120 job-shop and flow-shop scheduling problems (including the famous 10–10). In case of no setup, in a few iterations, the makespan approaches a lower bound using very few sublots, suggesting that the procedure yields a global optimum. As a by-product, this result somehow validates the capacitated lot-sizing models in which the detailed capacity constraints, induced by the sequencing of operations, are ignored.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.